Wednesday, April 8, 2009

The beginnings of the nursery


Our little baby boy is only about 3 months away and we are working on getting the nursery ready. We have ordered all the furniture as well as the bedding, but its about 2 weeks out for delivery so for now, we got the room all painted. We are doing the room in blue and brown so we decided to paint a very light blue base with one shade darker of stripes in various widths to give it some texture. This picture is also staring the top part of Meow Zoom and his glowing eyes... :-)

Tuesday, February 24, 2009

Our Baby Boy

Today we found out we are having a baby boy. He was very happy to let us all know that he was a boy and was super cooperative and just active enough for the ultrasound tech to get all her measurements to assure us that we are having a healthy baby boy. This video was taken at the end of our ultrasound so he was winding down to take a little nap but still had some activity going on. If you can't tell, the head is on the right side of the screen, he is laying on his back so you see a profile of the face and he pulls his legs up towards his head while also moving his arms. Its only 13 seconds so watch it several times!! Enjoy!

Tuesday, December 2, 2008

Wednesday, October 1, 2008

Tuesday, September 16, 2008

Knobs and broomsticks

Well there was a broomstick on one of the pictures but the fancy zooming in cut it out :-) All the appliances will be delivered tonight so they should be installed very soon. We are having a minor setback (hopefully only minor) with the granite countertops... they guy's phones seemed to be shut off, not so sure what is going on but anyhow, one way or another we will get the counter tops but until then, no sink. The tile will get finished up soon as well and we should have a brand new kitchen! All the new interior doors were installed today as well. Its starting to feel like a new house all together.

Thursday, September 11, 2008

The tile is being installed

Once the tile is a bit further along and cleaner I will take some pictures of it here. He just got started. Right now it looks like we will be painting this weekend and the cabinets will be installed on Monday and then we are almost there.......

Saturday, September 6, 2008

Living Room Ambiance

We now have beautiful lighting in the living room!

Thursday, September 4, 2008

I think we are at the half way point...

Today we are 18 days in to the main part of the project- tearing out the kitchen. We now have walls and lights! It makes a huge difference. Right now we are pretty much on track to finish up sometime during the week of the 15th.

Monday, August 25, 2008

Week 1 of demolition

The first week of demolition has been pretty trying on us. Mostly for the fact that we dont have anywhere to cook our food. It's been raining, but we have been cooking outside on the BBQ, and the fridge is in the garage. Not sure how much longer till this is all done, but we are managing!

Monday, August 11, 2008

No more popcorn ceilings!

The first phase of our remodel was actually removing the poporn from the ceiling. It took two weeks total. The first week was the main part of the house, the second week was the last two bedrooms.

Saturday, August 2, 2008

yard Remodel

The yard was supposed to be done this summer..... we will let you know how it goes. So far we have done all the work ourselves. It has taken us much longer then expected and that is mostly due to the fact that we have to dig a drain trench that is on a slight slope going towards the side yard for all the water runn off. At the end of this trench it needs to be about 14" deep so you can imagine why it is taking so long. Plus our yard is pretty much made up of cement and rocks. The goal of the yard remodel is to extend our patio quite significantly with flagstone. Because our yard has a pretty decent slope downwards towards the house, we are extending the patio and building a retaining wall and then leveling out the grass behind it. We are actually doing a double retaining wall. A small flower bed will sit behind the first wall and then the next wall up will be the border to the yard. We are also including a few steps in order to make it easier to get to the grass. I also through it a fountain area last minute that is taking a lot of time to dig out.

Friday, August 1, 2008

Bye Bye Kitchen

This was our kitchen......

Week 1 of the remodel consists of the tear out of all 7 layers of lanolium and plywood that has been here since the 1970's. Now we are left with an ugly avocado green floor until the new tile gets layed next week.